RaiseRaise Elevators
Installation & engineering

The shaft decidesmore than the cabin.

A lift only performs as well as the shaft, headroom, power and structure around it. We measure first, then commit to a configuration.

Before we quote

Six checks that preventsix-figure surprises.

These are the items that most often change a lift design after the order. We record them before the configuration is fixed.

Shaft dimensions

Internal clear sizes, plumb and verticality — recorded, not taken from an old drawing.

Headroom & pit

Overhead clearance, pit depth and buffer space verified against the proposed model.

Power & earthing

Supply capacity, isolation point, cable route and earthing checked with the electrical team.

Access & lifting

Material routes, door openings, staging area and lifting points planned before delivery.

Structure

Load paths, counterweight space and fixing strategy reviewed with the structural engineer.

Building interfaces

Landing finishes, fire strategy, ventilation and other services coordinated early.

Installation sequence

A site is a sequence,not a delivery.

Each stage is signed off before the next one depends on it. That is how handover dates stay believable.

  1. 01

    Consultation

    We start with building type, usage, floor count and the constraints you already know about.

  2. 02

    Site inspection

    Shaft dimensions, headroom, pit depth, power supply and access routes are recorded on site.

  3. 03

    Planning & design

    Configuration, capacity, finishes and interface points are agreed before anything is ordered.

  4. 04

    Engineering

    Drawings, structural interfaces, electrical requirements and installation sequencing are coordinated.

  5. 05

    Installation

    Rails, machinery, doors, cabin and wiring are installed by the project team with site supervision.

  6. 06

    Testing

    Door operation, levelling, safety circuits and ride quality are checked stage by stage.

  7. 07

    Commissioning

    The installation is commissioned against the agreed specification and inspected before handover.

  8. 08

    Handover & care

    Documentation, operating guidance and a maintenance plan are handed over with the keys.

Site safety

An installation is a construction site.

  • Landing and shaft openings are barricaded and signed for the full installation period.
  • Lifting operations follow a written plan, with the site team briefed before each stage.
  • Electrical isolation and lock-off procedures are agreed with the main contractor.
  • Daily housekeeping keeps access routes and fire exits clear.
  • Testing happens stage by stage, with results recorded before commissioning.
Project planning

Have a shaft
or a set of drawings?

Send the drawings, floor count and building use. We will identify what can be confirmed remotely and what needs a site visit.

Product availability and service coverage are confirmed for each project after a site review.